Friday, November 12, 2010

HC Stream Restoration Plan Presentation to the DRB on November 16th, 7-9PM

RA's Design Review Board (DRB) will hear the WSSI presentation on the HC stream restoration project and replacement bridge at the next monthly meeting, November 16th 7-9PM.

Note From SCCI:
Frank (WSSI) will give the presentation, but please encourage HCA members to sign up to speak so DRB has an opportunity to hear the thoughts from the community.
Stream Restoration Proposal
Apologies for the quality of some of the slides.

Follow up: DRB Meeting Summary by Fred S.
Tuesday evening the DRB voted to approve the preliminary design for the stream restoration, including the bridge proposal. WSSI will come back to DRB for information updates as the plans move forward, and final approval of detailed design including bridge details. No significant issues were raised and there was not much discussion by the DRB members. One new piece of information is that the adjacent Vantage Hill stream looks as if it will not go forward due to lack of cooperation from VDOT which is reluctant to accept an easement along Baron Cameron Ave. ("in case they ever need to widen the avenue").

Friday, November 5, 2010

Friday Night Panel Discussion on the Future of the Town Center: Tonight!

Tonight! (& apologies for the late notice.)
Friday night, November 5, 7:00 PM – 9:00 PM is the final panel discussion on the future and vision of the Reston Town Center – Visions for the Future (2010-2030) with the coming of Metro.

The Town Center subcommittee co-chairs Robert Goudie and Pete Otteni will be presenting their PowerPoint presentation and draft report to the Reston Master Plan Special Study Task Force.

This panel will provide Reston citizens an opportunity for interactive an Q&A session on the subcommittee recommendations to the main Task Force.

Location: Reston Community Center at Lake Anne Village Center
Date and Time: Friday Night, November 5, 7:00 PM – 9:00 PM

Topic and Format: Future development options of the Reston Town Center with the coming of Metro and recommendations to amend revision of Fairfax County’s Comprehensive Plan.

Loren Bruce
Phone: 703-408-2931
EMail: lcbruce@verizon.net