Construction Progress More Visible
Stay Informed and join now to receive construction related email or fax alerts. Please sign up for our Information Network by visiting www.dullesmetro.com.
Hotline For emergency construction related issues, please call our 24 hour/7days a week Hotline at (877) 585-6789.
Want to Know More? To set up a briefing for your homeowners association, civic group, or business please email outreach@dullesmetro.com or call (703) 448-5550.
Construction Progress More Visible
Construction activities are officially underway along the entire alignment of Phase 1 of the Dulles Corridor Metrorail Project.
Dulles Connector Road/I-66 Interchange
Caissons and piers, which will support foundations for at-grade andaerial track work, are being built. You will continue to see more of these develop along the Dulles Connector Road median in the coming months.
Dulles Connector Road
During the week of Aug. 10, overnight work will close the eastbound Dulles Connector Road (Route 267) ramp to northbound Route 123. Drivers will be directed to detour by using the ramp to southbound Route 123 and using the traffic signal to access the northbound lanes.
Route 123
Early preparation of the eastern portion of the 2,400-foot tunnel has begun at Route 123 and International Drive, including construction of a concrete plant. This month, other equipment and facilities essential to the tunnel construction will be put into place. Preliminary foundation work is taking place for the Tysons Central 123station at Route 123 and Tysons Boulevard.
Route 7
The ramp from southbound Route 123 to Route 7 will close temporarily overnight Aug. 7-8. Construction crews will permanently remove traffic signals and reconfigure the traffic plan. After Aug. 8, the ramp will only reopen for westbound Route 7 only. Eastbound Route 7 fromsouthbound 123 will remain closed. Please use southbound International Drive to access eastbound Route 7. The two-way Frontage Road along the north side of Route 123 between International Drive and Route 7 is subject to nighttime closures to support ongoing utility relocations. Business access remains open during this work. Work has begun on the western portion of the tunnel at the northwest cloverleaf at Route 7 and Route 123 along the Frontage Road. Dulles International Airport Access Highway (DIAAH) and Dulles Toll Road (DTR)Construction has started in the median of the DIAAH near the future Wiehle Avenue station. Ongoing Work Utility relocations and occasional lane closures will continue alongthe Route 7 service roads, portions of Route 123, the DIAAH and theDTR. Access to all businesses will be maintained throughout this work. Ramp closures are scheduled at night in order to avoid peak traffic hours. Motorists should stay alert and be prepared to alter their travel along these roads.
Friday, August 14, 2009
Monday, August 3, 2009
White Roofs Catch On as Energy Cost Cutters
Is it time to replace the membrane roof? Nice NYT article about the energy cost benefits of a white roof. Thanks to Eric for the link!
Friday, July 24, 2009
Indoor Recreation Resolution Means Brown's Chapel Park Won't Be Considered
Brown’s Chapel Park is now “off the table” in any plans for an indoorrecreational facility in Reston. In a seven to two vote, the Board of Directors voted to “discontinue further discussion of constructing anindoor recreation facility at Brown’s chapel Park.”At the July 23, 2009 meeting, the board also ruled out leasing, deeding or transferring any part of Brown’s Chapel Park to Fairfax County or any other entity. However, the measure also leaves open the door for future upgrades tothe park’s ball fields, pavilions, equipment and picnic facilities.The measure calls for concluding the relationship with consulting firm Brailsford & Dunlavey, which conducted a market feasibility study ofindoor recreation. Additionally, the resolution encourages acontinued working relationship with Reston Community Center to exploreoptions for providing year-round recreation.The move comes on the heels of four community-wide meetings in which many citizens said they would support indoor recreation but would notbe in favor of giving up “open space” to achieve that goal. Community responses to surveys conducted during those meetings arebeing compiled for presentation to the board and community in the fall.
Thursday, June 25, 2009
Snakeden Stream Restoration Tour
There will be a guided walk along the restored length of stream at Snakeden Branch to explain what was done, Sat. June 27 from 9am to noon.
From RA
The general public stream walk that shows the stream restoration one year after construction starts at 9:00 a.m. We will meet at the Rite Aid parking lot at the Hunters Woods Village Center. Please wear long pants and closed toe shoes/boots that can get wet or muddy.
This will be useful for those wondering what might be in store for the planned restoration of Hickory Cluster's stream flowing into Lake Anne. The details of the restoration will likely be different due to the differences in stream size and flow, but this will be a chance to discuss the options and understand the process. RSVP is to Nicki@reston.org or call 703-435-6560.
RA Background Information on Stream Restoration including great video introduction with before and after shots.
RA Plan
From RA
The general public stream walk that shows the stream restoration one year after construction starts at 9:00 a.m. We will meet at the Rite Aid parking lot at the Hunters Woods Village Center. Please wear long pants and closed toe shoes/boots that can get wet or muddy.
This will be useful for those wondering what might be in store for the planned restoration of Hickory Cluster's stream flowing into Lake Anne. The details of the restoration will likely be different due to the differences in stream size and flow, but this will be a chance to discuss the options and understand the process. RSVP is to Nicki@reston.org or call 703-435-6560.
RA Background Information on Stream Restoration including great video introduction with before and after shots.
RA Plan
Wednesday, June 17, 2009
United Christian Parish Expansion

Over the last few years, the United Christian Parish Church has been working on plans to expand their present building to approximately triple the size of what it is now. The plan includes the removal of the "rectory" house that currently exists on North Shore Drive next to Hickory Cluster (Block 3) and a portion of the existing woods and trees to be replaced by additional parking and a brand new parking lot access onto North Shore Drive. The above drawing (click to enlarge) reflects the church expansion plans as of October '08.
The church has approached HC to ask for a HC vote on a county easement (2/3 of resident "yes" vote needed) on cluster property bordering North Shore Dr. between HC and the proposed new parking lot outlet that would require HC to remove all obstructions to visibility (trees, vegetation, green power box, etc.) back 25ft to satisfy the county by increasing motorist visibility while exiting the church from the new access. To date, the church has offered to pay for the cost of the vote and the costs involved in complying with the easement. The date for the vote TBA.
-Sara
Reston License Plate
Virginia is accepting pre-orders for Reston license plates; the Reston Citizens Association (RCA) is handling the orders with a $10 deposit per order; when a total of 350 orders have been received the state will then begin production of the plates. The application form can be downloaded from www.restoncitizensassociation.org; the check should be mailed to:
Reston Citizens Association
P.O. Box 2851
Reston VA 20195.
More information is available from Dan McGuire: email to GUILDMORE@aol.com.
Reston Citizens Association
P.O. Box 2851
Reston VA 20195.
More information is available from Dan McGuire: email to GUILDMORE@aol.com.
Monday, June 15, 2009
Cluster Work Day and Party
Neighbors and Friends--
By any measure the Cluster work day and party this past Saturday was a smashing success. Thanks to all who participated for the hard work in mulching, planting, power washing and painting to make the Cluster shine. Special thanks to Madeline Cohen (III) for organizing and Shirl Sellers (II) for the grill and set-up arrangements for the party. We all can take great satisfaction in what was accomplished on Saturday. I would encourage everyone to make the time to take a walk around the common areas of each of the three blocks in the next few days to appreciate what a beautiful place this Hickory Cluster is. We all share the responsibility of keeping it that way.
Cheers,
Bob Anderson
By any measure the Cluster work day and party this past Saturday was a smashing success. Thanks to all who participated for the hard work in mulching, planting, power washing and painting to make the Cluster shine. Special thanks to Madeline Cohen (III) for organizing and Shirl Sellers (II) for the grill and set-up arrangements for the party. We all can take great satisfaction in what was accomplished on Saturday. I would encourage everyone to make the time to take a walk around the common areas of each of the three blocks in the next few days to appreciate what a beautiful place this Hickory Cluster is. We all share the responsibility of keeping it that way.
Cheers,
Bob Anderson
Wednesday, June 3, 2009
RELAC: Plant Improvement Needed
RELAC cluster presidents and residents met on 6/2. Our Aqua Virginia representative was not able to attend but sent this letter. The proposed and necessary new pump station for the intake would cost $175,000 and the average user (average being $770/yr) an additional $160.00 per season.
Tuesday, June 2, 2009
Welcome to the Hickory Cluster Blog
The goal of this blog is have an information resource for Hickory Cluster residents on topics ranging from recommended contractors to RELAC.
Posting
Submit anything you would like to post on the blog to me at sara.bradley@comcast.net Posts to the blog will be made at the discretion of the Hickory Cluster board.
Comments
Right now, anyone can publish a comment to any post. Our hope is that comments will always be constructive and considerate. If that changes, we will switch to moderated comments.
Subscribe to Blog
This blog is hosted for free by Google. In the bottom right corner are two pull down menus for subscribing to this blog via Google, Yahoo and a few others. If you sign up for free to igoogle (or one of the other offerings on the menu) you can track new activity on the blog. This frees you up from having to come to the site to see if there is new information. You can also subscribe to the Hickory Cluster Calendar via Google by scrolling down to the bottom of the calendar. To sign up for igoogle, you must first have a gmail account (this is free) linked to your own email account.
Note: I have never gotten an email from google or anyone else via my gmail account. It simply allows you to access benefits of igoogle, etc.
Labels
I will try to label posts accurately so anyone coming to the blog can find out more about a certain topic can click on the topic under "labels" in the right column and see all the posts on that subject.
Email List
I am compiling an email list of Hickory Cluster residents to occasionally send out emails about important events or concerns affecting our cluster. If you would like to have your email on this list, please email me your:
Posting
Submit anything you would like to post on the blog to me at sara.bradley@comcast.net Posts to the blog will be made at the discretion of the Hickory Cluster board.
Comments
Right now, anyone can publish a comment to any post. Our hope is that comments will always be constructive and considerate. If that changes, we will switch to moderated comments.
Subscribe to Blog
This blog is hosted for free by Google. In the bottom right corner are two pull down menus for subscribing to this blog via Google, Yahoo and a few others. If you sign up for free to igoogle (or one of the other offerings on the menu) you can track new activity on the blog. This frees you up from having to come to the site to see if there is new information. You can also subscribe to the Hickory Cluster Calendar via Google by scrolling down to the bottom of the calendar. To sign up for igoogle, you must first have a gmail account (this is free) linked to your own email account.
Note: I have never gotten an email from google or anyone else via my gmail account. It simply allows you to access benefits of igoogle, etc.
Labels
I will try to label posts accurately so anyone coming to the blog can find out more about a certain topic can click on the topic under "labels" in the right column and see all the posts on that subject.
Email List
I am compiling an email list of Hickory Cluster residents to occasionally send out emails about important events or concerns affecting our cluster. If you would like to have your email on this list, please email me your:
NAME
ADDRESS
EMAIL
Thank you,
Sara
Monday, June 1, 2009
Cluster Clean Up & BBQ -- June 13th, 2009
The next Hickory Cluster clean-up is set for Saturday, June 13th at 9:00AM with a barbecue to follow.
Subscribe to:
Posts (Atom)